RPG ExcellencePartners
My platform
Start assessment →
NEW STANDARDISO 9001:2026 is now publishedSee what changed and prepare your quality management system.
Read full update
How it works

Safe operations

Workplace inspections

Follow a scheduled inspection from the programme and field checklist through findings, evidence and independent verification.

Workshop housekeeping inspectionFictional example

Walk through a workplace inspection

Each stage includes an actual RPG screenshot. The setup, checklist preview and review-role screens came from an unsaved programme. Field observations and verification outcomes are fictional.

Programme coordinator

Plan and schedule

Planned

Choose the location and checklist, schedule fieldwork, and assign a lead inspector and a separate independent reviewer.

Actual RPG programme setup. The demo form was left unsaved and no fieldwork was scheduled.
Example record · Example fieldwork assignment
Lead inspector and independent reviewer assigned to the workshop inspection.

Programme and location

RPG programme form with a demo title and the inspection template, site and zone fields
Workplace inspections walkthrough | RPG Excellence