Follow an electrical permit for a CNC machining centre. See who verifies the controls, who accepts the work and what RPG records before the permit can be closed.
CNC commissioning exampleElectrical workLinked risk assessment RA-2026-0002
Walk through a permit
Follow a fictional CNC permit. Stages 1–4 include screenshots of the RPG draft form. Completion, hand-back and the audit trail use example records.
Permit preparer
Define the work
Set the task and scope limits. Select the controlled Site Profile, work area and asset, identify the work party and link the approved CNC risk assessment.
Record the hazards, required precautions, validity window and permit roles before progressing the draft.