RPG ExcellencePartners
My platform
Start assessment →
NEW STANDARDISO 9001:2026 is now publishedSee what changed and prepare your quality management system.
Read full update
How it works

Safe operations

Permit to Work

Follow an electrical permit for a CNC machining centre. See who verifies the controls, who accepts the work and what RPG records before the permit can be closed.

CNC commissioning exampleElectrical workLinked risk assessment RA-2026-0002

Walk through a permit

Follow a fictional CNC permit. Stages 1–4 include screenshots of the RPG draft form. Completion, hand-back and the audit trail use example records.

Permit preparer

Define the work

Draft

Set the task and scope limits. Select the controlled Site Profile, work area and asset, identify the work party and link the approved CNC risk assessment.

Actual draft form showing the work scope and risk assessment link.

Record the hazards, required precautions, validity window and permit roles before progressing the draft.

Define the controlled work

RPG scope form with Electrical work selected and CNC risk assessment RA-2026-0002 linked.
Permit to Work walkthrough | RPG Excellence