RPG ExcellencePartners
Checking account…
Start assessment →
NEW STANDARDISO 9001:2026 is now publishedSee what changed and prepare your quality management system.
Read full update
How it works / Business control

BUILDINGS & ZONES MANAGEMENT

Scan the code.
Know the work area.

A QR code at the entrance gives personnel and leaders a direct route to the safety information published for that zone. Local restrictions, signs, linked risk assessments and inspection status are available where the work happens.

For someone starting a task, that means less searching for the relevant controls. For a leader visiting the area, it means a clearer view of what applies, what is due for review and where follow-up is needed.

Published information follows the zone’s saved access settings. An internet connection is required.

RPG EXCELLENCE Employee zone page

Screenshot

Employee zone page with safety information links and a communicated risk assessment

Screenshot

Zone page showing inspection status, available assessments and the report an incident or concern button

Actual platform screens supplied on 19 November 2026. These are demonstration records, not instructions for an operational area.

START WITH A SHARED LOCATION RECORD

A site, its buildings
and the areas people use.

Set up the working location once, then organise its buildings and zones. A zone can be a workshop, laboratory, kitchen, yard or another defined area. External areas can be managed without assigning them to a building.

Screenshot

Company Setup navigation showing locations, buildings and zones alongside departments and people

Company Setup brings the working locations and the people responsible for them together.

Use the same place across the platform.

The controlled site record is used by operational modules such as risk assessments, permits, assets and audits. Buildings and zones add the detail needed to connect those records to a specific work area.

That shared structure helps the team find the right record and reduces ambiguity about where it applies.

FROM THE REGISTER TO THE WORK AREA

Set it up. Link the records.
Publish what people need.

Select a stage to see the real screens and how the location record becomes useful on the floor.

Start with the controlled site.

Choose the working location from Company Setup. Each site has a reference and operating status, with its buildings, zones and departments accessible from the saved record.

Screenshot

Start with the controlled site. Actual RPG Excellence demonstration screen.

Actual interface. Personal details and example QR destinations are hidden where present.
Working location

HSE INFORMATION AT THE POINT OF WORK

One scan opens the local picture.

When the zone is published and access permits it, scanning its poster opens the employee page. Personnel can check the relevant instructions before a task. Leaders can use the same page during a site visit or discussion with the team.

Local restrictions and signs

See published area restrictions, safety signs and the zone’s reviewed PPE requirements. Warnings remain visible when requirements need review.

Linked risk assessments

Open assessments made available to the zone with an approved or communicated status. Check their reference, version and review date, then read the hazards and existing controls.

Emergency information

Find the local emergency instructions published for the area. The zone owner maintains the content so it reflects the arrangements people are expected to follow.

Inspections and actions

See recorded inspection activity, upcoming or overdue programmes and open action counts. These give a visiting leader a practical starting point for follow-up.

Report a concern

Use the incident or concern link from the work area. Anonymous reporting is available without signing in. For immediate danger, follow the site’s emergency procedures.

A stable point of access

The permanent zone link stays with the work area while published information is updated online. Check the displayed poster revision when a replacement is required.

Screenshot

Area signs and PPE requirements with a safety-sign review warning

Review warnings and area signs stay in view. Confirm the task requirements when a review is due.

Screenshot

Safety information links and a communicated risk assessment with version and review date

The linked assessment is identified by its reference, version, status and review date.

Screenshot

Zone inspection section showing an inspection awaiting review, one open action and overdue status

Inspection completion and open actions can be read together. A completed inspection does not establish that the area is safe.
Buildings & Zones Management | RPG Excellence | RPG Excellence